Engineering.Construction.Commissioning.

Engineering for critical production environments.

Integrated technical infrastructure for pharmaceutical and food production — from engineering and commissioning through system qualification, digitalisation and lifecycle support.

Clients & project partners

Project experience in pharmaceutical and food production.

Technical project work in and around GMP environments — from sterile production to hygienic process plant.

Abbott
Boehringer Ingelheim
Drees & Sommer
Celonic
WuXi Biologics
Bitop
MHG Prozesstechnik
Milchwerke Schwaben
Milchwerk Baden-Württemberg
Goldmilch
Alpenhain
The lifecycle of critical production

Between planning, construction and operation, critical gaps open up between requirement and execution — that is exactly where we come in.

Eight phases carry a plant from first understanding through to routine operation; the technology in each phase is rarely the problem.

  1. 01 · Project Understanding

    Clarifying requirements and criticality: what does the plant have to do, and what is regulated?

  2. 02 · URS / Basic Design

    User requirements and basic design — the basis for everything that follows.

    Break point 02 → 03

    Not every URS requirement makes it into the traceability matrix.

  3. 03 · Detail Design

    Detailed design with traceability: every requirement stays traceable.

    Break point 03 → 04

    Design status and site execution drift apart.

  4. 04 · Construction

    Construction and installation — the plant takes shape.

    Break point 04 → 05

    Mechanical completion is not the same as ready for commissioning.

  5. 05 · Commissioning

    FAT/SAT and start-up: the plant is brought into operation.

    Break point 05 → 06

    Interfaces arrive too late for qualification. Sign-offs are blocked.

  6. 06 · DQ / IQ / OQ / PQ

    Qualification — the documented evidence that everything performs to specification.

    Break point 06 → 07

    Qualification runs after the fact instead of alongside — DQ/IQ/OQ/PQ delay the start.

  7. 07 · Handover

    Handover and documentation: the plant passes to operations.

    Break point 07 → 08

    Operations take over with gaps in knowledge and documentation.

  8. 08 · Operation

    Ongoing operation: maintenance, safe isolation (LOTO), lifecycle support.

One responsibility

We close thelifecycle.

End to end across all eight phases — one responsibility instead of six handovers.

How we cover the lifecycle
Software · ecc OS

The whole plant in one system — mapped, tested, qualified.

ecc OS is our in-house software for commissioning and qualification. It maps the plant as a system — in 3D and as a flow diagram.

  • Windows · macOS · iOS · Android · browser
  • 3D plant model and flow diagram
  • Photos as evidence
  • Audit trail and e-signature
  • Our own projects run on it
Plant model of an example plant in ecc OS with labelled vessels, still, filling line and CIP unitecc OS
  1. B 951 Raw water tank 25 m³
  2. W 300 WFI still
  3. B 301 WFI storage tank 6 m³
  4. B 101 Preparation vessel 2.0 m³
  5. AF 800 Filling line
  6. CIP 200 CIP unit

Example plant · 3 buildings · 9 subsystems · 20 elements · 19 lines · 8 media

The lifecycle

One project timeline. Four fields that interlock.

We support the project throughout — four fields that interlock across the phases.

01 Project definition · 02 URS / Basic Design · 03 Detail Design · 04 Construction · 05 Commissioning · 06 DQ / IQ / OQ / PQ · 07 Handover / Documentation · 08 Operation

Production IT & Automation

01–08
01
02
03
04
05
06
07
08

Commissioning & Start-up

04–08
01
02
03
04
05
06
07
08

Qualification & Documentation

03–07
01
02
03
04
05
06
07
08

Special Hardware, LOTO & Freeze

01–08
01
02
03
04
05
06
07
08

We cover every phase — four fields interlock across the project rather than delivering in isolation.

Project experience

From a heterogeneous starting point to production-ready handover.

More than 25 years of project work in regulated pharmaceutical and food production — every project evidenced step by step, from a heterogeneous starting point through to handover to operations.

Production readiness & evidenceIntakeProduction-ready handoverProject timeline010203040506
Standards & regulations

Measured against the standards that count in regulated production.

EU-GMP Annex 1EU-GMP Annex 1121 CFR Part 11ALCOA+GAMP 5 / CSVHACCPIFSISO 9001
25+
years of experience in the team
30
projects a year in regulated production
50+
engineering specialists
Platforms
Control systems3
Siemens PCS 7DeltaVSiemens SISTAR
SCADA & HMI6
WinCCWinCC UnifiedWinCC flexibleTIA PortaliFIXInTouch
PLC5
SIMATIC S7SIMATIC S5SIMATIC S7-1500HoneywellB&R
Data & interfaces5
MESHistorianOPC UAMQTTMTP

Vendor-independent — we assess on the merits, not by product line.

View all projects
Careers

Responsibility from day one. Depth over years.

If you want to drive your own projects, you will find real ownership here — and a learning curve that leads over the years into technical depth and leadership.

Development over the years
01
Joining

Your own projects from day one — alongside experienced engineers, with direct feedback instead of years spent assisting.

02
Responsibility

Your own decisions on real plants. The engineering stays at the centre.

03
Depth

Over the years, genuine specialist knowledge builds — in engineering, commissioning and qualification.

04
Leadership

Take on responsibility and you grow into it — technically and within the team. Development comes through real projects, not job titles.

Sounds like your kind of work?

Get to know us and the roles we have open — or send us a speculative application.

Project enquiry

Planning an automation, commissioning, qualification or technical upgrade?

The earlier technical delivery, documentation and operation are planned together, the less friction the project runs into later.