Software · ecc OS

The whole plant in one system — mapped, tested, qualified.

ecc OS is our own software for commissioning and qualification. It represents the plant as a system — in 3D and as a flow diagram, operated like a digital twin: click an element, trace a medium, see the test status. Test documents, photos as evidence and electronic signatures are created at the test step, on iPad and phone. For pharmaceutical and food production under GMP; cleanly licensable.

Compliance & data integrity
  • Windows · macOS · iOS · Android · browser
  • 3D plant model and flow diagram
  • Photos as evidence
  • Audit trail and e-signature
  • Our own projects run on it
01 / 06
System list

Every component recorded — with attributes, classes and origin.

Five levels from the plant down to the instrument tag. The catalogue brings 75 categories, more than 120 attribute classes and 1 806 fields; every field knows its source. Lists from COMOS, Excel or other systems are imported and reconciled against the existing data.

  • Table and pivot views, filterable by any attribute and any class
  • Search in plain engineering terms: “Equipment in TA100 without attribute class”
  • Quantity structure for test scope and effort straight from the list
02 / 06
Plant model

A plant model that can be operated like a digital twin.

The model reads the system list and responds: click an element, trace a medium, show the process path and isolation points. The same data as a flow diagram to ISO 10628 — exportable as a technical drawing.

  • Overlay the hall layout as PDF, check the arrangement
  • Which valve sits where, which medium flows where — flow diagram and model from one source
  • Extend and expand the plant: the model grows with it
03 / 06
Qualification

Test documents from more than 150 test sheets, signatures bound to the document hash.

Test objectives × systems yield the test instances; the documents come from our library of more than 150 test sheets. Executor, reviewer and customer sign in three stages, each signature bound to the hash of the content. Photos as evidence, defects and test equipment directly at the test step — on iPad and phone, also without a network.

  • IQ, OQ, PQ per element and per subsystem, available at any time
  • Suppliers sign in the released test sheet with a one-time code
  • Test equipment with calibration lock, defects with follow-up
04 / 06
LOTO & operation

Isolation points on the process path, change control in operation.

The process path shows every isolation point and reports gaps without local isolation. In operation the qualification status stays valid: change requests with a frozen requalification scope. On request, ecc maintains the model along with the plant — under a maintenance contract.

  • Energisation and media matrix from the same data
  • Mobile at the test step: scanner, camera, feedback
  • Operator and company access via your own Microsoft directory
05 / 06
Project controlling

Planned effort from quantity structure and time key, actuals from time booking — progress per subsystem.

The system list counts what has to be tested; the time key per object class turns that into the planned effort. Actuals come from time booking at the test step. Progress and backlog are shown per subsystem and as an S-curve for the project.

  • Work packages, milestones, organisation from mobilisation to handover
  • Backlog in percentage points, not in gut feeling
  • Empirical values P50/P80 for the next quotation
06 / 06
Handover & archive

Handover package with checksums. Archive readable for 15 years.

The handover package contains all test documents, the flow diagrams as technical drawings, the photos as evidence and the system list — frozen with checksums and sealed. Readable over the entire retention period, even without ecc OS.

  • Handover per subsystem or for the whole plant
  • Retention of 15 years preset
  • Audit trail complete, also towards administrators
Compliance & data integrity

Every change logged, every signature bound to the hash, readable for 15 years.

Developed from 25 years of commissioning and qualification; our own projects run on it. Status of the software as of October 2026.

25Years of commissioning and qualification
150+Test sheets in the library
120+Attribute classes
1,806Catalogue fields with source reference
15Years of readable archive
01

Audit trail EU GMP Annex 11 · 21 CFR Part 11

Every change with timestamp, person, previous and new value. Complete also towards administrators and the operator of the database.

02

Electronic signature Executor · Reviewer · Customer

Three stages, each bound to the hash of the document content. A change after signing invalidates the signature.

03

Access Roles · Directory · Suppliers

Login via the company's Microsoft directory, roles by responsibility. Suppliers see the released test sheet. Access ends by date.

04

Data integrity ALCOA+

Recording at the test step with timestamp and person, photos referenced by checksum, raw data retained, corrections visible.

05

Data storage EU · Tenant · Backup

Data centre in the EU, tenant separation in the database, encrypted transmission, daily backup.

06

Archive 15 years

Handover package with checksums and sealing: test documents, flow diagrams as technical drawings, photos, system list. Readable over the entire retention period.

07

Change control Operation

Change requests with a frozen requalification scope and request-bound signature.

08

Offline Site

Record test steps, photos and defects without a connection, store them encrypted, synchronise at the next contact — with the timestamp of recording.

For operators

What the plant can do in operation after handover.

Qualification does not end with handover. The model remains the tool for isolation, change, test equipment and defects — with the same audit trail.

LOTO & isolation

Isolation points on the process path, 48 media codes, energies per point. Gaps without local isolation are reported.

Energisation & media matrix

Which subsystem needs which medium — from the categories of the system list, not from a second table.

Change control & requalification

Change request with frozen scope, request-bound signature, requalification only where it is needed.

Test equipment & calibration

Test equipment register with calibration lock: an expired device can no longer confirm a result.

Defects & open items

Finding at the test step, follow-up kept separate, mobile with photo and scanner. Open, in progress, done — per element.

Qualification of persons

Whoever signs must be qualified: certificates on the person, lock on the signature, notice before expiry.

History as of a date

What did the plant look like on the day of the inspection? Every state can be reconstructed — audit view included.

Operator and company access

Your team works via its own Microsoft directory; suppliers see only their test sheet. Notifications on dates, calibrations and qualifications.

Project management & controlling

Commissioning as a project: work packages, organisation, planned and actual.

ecc OS runs not only the testing but the project around it — with the same data.

25 %50 %75 %100 %CW 40CW 44CW 48CW 52CW 56Actual 68 %Planned 74 %today

S-curve of the example project: planned from quantity structure × time key, actual from time booking. As of CW 50.

  • Work packages with scope from the system list, status in one figure per package
  • Organisation from mobilisation through safety, energisation and transfer of risk to the operator handover — documents from templates per level and per system
  • Planned effort from quantity structure and time key per object class; actuals from time booking at the test step
  • Progress per subsystem and as an S-curve, backlog in percentage points
  • Empirical values P50/P80 from completed projects — for the next calculation
Interfaces & API

Data comes in, evidence goes out — and systems talk to each other.

ecc OS is not a closed box. What you have is taken over; what is created, you receive in your format.

Import

  • COMOS export with import status and UID, reconciliation against the existing data
  • Excel and CSV lists with configurable column mapping
  • P&ID and system lists as PDF or scan: the AI reads, a person confirms

Export

  • Flow diagrams as technical drawings
  • Test documents as PDF and Word in the ecc format
  • System list, handover package, archive with checksums

Integration

  • Microsoft 365: login via Entra, filing in SharePoint, meetings in Teams
  • REST API, multi-tenant, with the same permissions as in the app
  • MCP server for AI assistants: questions to the system list in plain engineering terms, read-only
One software

Windows, macOS, iPhone, iPad, Android — and the browser.

One version for all devices, updates automatic. Record on site without a network, review in the office on the large screen. Data in the EU, data protection under the GDPR, built for GMP-regulated production — our own commissioning projects run on it.

  • Windows
  • macOS
  • iPhone & iPad
  • Android
  • Browser
App icon of ecc OS: green tile with a white check markecc OS
Who it is for

Operators, plant engineering, suppliers — one data set.

Everyone works in the same system list, each with the access of their role.

Operators

Pharmaceutical and food manufacturers commissioning, extending or requalifying a plant.

  • Qualification status per element and subsystem
  • Signature as customer directly on the document
  • ecc OS comes with the project and stays under the maintenance contract

Plant engineering & EPCM

Planners and general contractors responsible for commissioning and qualification.

  • Take over the system list from COMOS and other sources
  • Test documents from the library, progress as an S-curve
  • Effort from quantity structure and time key

Suppliers

Manufacturers of equipment and skids contributing FAT, SAT and documentation.

  • Access to the released test sheet with a one-time code
  • Fill in and sign as executor
  • Return directly into the project's evidence
Introduction

At your plant in five steps.

ecc carries out the introduction itself — with the people who use ecc OS on site.

1

Take over the system list

Import COMOS, Excel or other exports, confirm the reconciliation.

2

Adapt the catalogue

Tailor categories, attribute classes and value lists to the project.

3

Test objectives and modules

Build the test objective matrix, choose test modules from the library or add your own.

4

Set up access

Connect the Microsoft directory, assign roles, release suppliers per test sheet.

5

Get started

First test instances, first signatures — with the ecc project team.

Licence & collaboration

Comes in with the project, stays under the maintenance contract — or as a licence.

ecc OS is cleanly licensable. Above all, though, it comes with us into the project: we commission and qualify in ecc OS, and afterwards the model of your plant stays in our care under the maintenance contract.

In the project with ecc

Commissioning and qualification by ecc

  • ecc OS is part of the service — system list, test documents, handover
  • Your people work along: access for operators and suppliers
  • The model of your plant is part of the handover

Subscription with maintenance contract

For operators after commissioning

  • Plant model, flow diagrams and qualification status stay current
  • Changes, extensions and requalification are maintained by ecc
  • Change control, access, archive — a fixed contact person

Licence

Per company, standalone

  • Any number of projects and plants
  • Introduction and training by ecc
  • Desktop, browser, iPad and phone; automatic updates; EU data centre
Next step

A demonstration on your system list.

One hour online: your list, our system. Choose a date directly.